{"id":16605,"date":"2020-05-28T14:43:35","date_gmt":"2020-05-28T12:43:35","guid":{"rendered":"http:\/\/straton.acces-provisoire.fr\/?p=16605"},"modified":"2020-07-29T11:06:56","modified_gmt":"2020-07-29T09:06:56","slug":"managing-a-metro-line-with-straton","status":"publish","type":"post","link":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/","title":{"rendered":"Managing a metro line with straton"},"content":{"rendered":"<h1><strong>DL PANAMA CHOOSES STRATON FOR PANAMA METRO LINE 2<\/strong><\/h1>\n<p><strong>DL Panama has chosen AU2MATION, historical straton distributor in the United States to provide a solution to support automation of key aspects of stations on Line 2 of the Panama Metro (Metro de Panama), elevated subway line, between San Miguelito and Nuevo Tocumen.<\/strong><\/p>\n<p>This follows from a previous similar project in 2013 to automate station elements on Line 1, which currently links Los Andes County to the city centre.<\/p>\n<p>An MMIM, from UK vendor Metasphere, together with the straton IEC61131-3 programming environment has been deployed at each station to interface the SCADA system to lighting control panels. In addition, an MMIM is deployed at each water pumping station and interfaces the SCADA to an ITT Flygt pump controller that controls between 2-4 pumps, depending on the station. These are used to pump out water from the train lines due to extreme rainfall and flooding.<\/p>\n<p><em>\u201cWe needed a solution that would be easy to deploy and required minimal support and maintenance.\u201d said\u00a0<\/em><strong><em>Sebastian Profili, Project Manager at DL Panama.<\/em><\/strong><em>\u00a0\u201cThe straton IEC61131-3 programming environment made it easy for us to develop the required interfaces to the many devices at each station. The high-reliability of the MMIM has reduced our time on site, allowing us to provide a better service to Metro de Panama.\u201d<\/em><\/p>\n<p><strong>About DL Panama<\/strong><br \/>\nDL Panama is a group of companies dedicated to the design and implementation of home automation projects, lighting control, networks, telephony, audio and video among others, with a focus on providing value in all projects in which we participate, simplifying the use of technology to our customers. DL Panama works hand in hand with and represents the most important manufacturers in the market such as Lutron, Crestron, Control4 and Sonos among others.<\/p>\n<p><a href=\"https:\/\/www.dlpanama.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">For more information click here<\/a><\/p>\n<p><strong>About AU2MATION<\/strong><br \/>\nAU2MATION delivers business value to customers through the application of automation in a three step process \u2013 supervize, analyze and optimize. To deliver this process AU2MATION provides consultancy, design, implementation, supply and support services using its own resources and in partnership with key alliances.<\/p>\n<p><a href=\"http:\/\/au2mation.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">For more information click here<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DL PANAMA CHOOSES STRATON FOR PANAMA METRO LINE 2 DL Panama has chosen AU2MATION, historical straton distributor in the United States to provide a solution to support automation of key aspects of stations on Line 2 of the Panama Metro (Metro de Panama), elevated subway line, between San Miguelito and Nuevo Tocumen. This follows from a previous similar project in 2013 to automate station elements on Line 1, which currently links Los Andes County to the city centre. An MMIM, from UK vendor Metasphere, together with the straton IEC61131-3 programming environment has been deployed at each station to interface the SCADA system to lighting control panels. In addition, an MMIM is deployed at each water pumping station and interfaces the SCADA to an ITT Flygt pump controller that controls between 2-4 pumps, depending on the station. These are used to pump out water from the train lines due to extreme rainfall and flooding. \u201cWe needed a solution that would be easy to deploy and required minimal support and maintenance.\u201d said\u00a0Sebastian Profili, Project Manager at DL Panama.\u00a0\u201cThe straton IEC61131-3 programming environment made it easy for us to develop the required interfaces to the many devices at each station. The high-reliability of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":16642,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[124,120],"tags":[],"class_list":["post-16605","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualites-en","category-news-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Managing a metro line with straton - straton<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Managing a metro line with straton - straton\" \/>\n<meta property=\"og:description\" content=\"DL PANAMA CHOOSES STRATON FOR PANAMA METRO LINE 2 DL Panama has chosen AU2MATION, historical straton distributor in the United States to provide a solution to support automation of key aspects of stations on Line 2 of the Panama Metro (Metro de Panama), elevated subway line, between San Miguelito and Nuevo Tocumen. This follows from a previous similar project in 2013 to automate station elements on Line 1, which currently links Los Andes County to the city centre. An MMIM, from UK vendor Metasphere, together with the straton IEC61131-3 programming environment has been deployed at each station to interface the SCADA system to lighting control panels. In addition, an MMIM is deployed at each water pumping station and interfaces the SCADA to an ITT Flygt pump controller that controls between 2-4 pumps, depending on the station. These are used to pump out water from the train lines due to extreme rainfall and flooding. \u201cWe needed a solution that would be easy to deploy and required minimal support and maintenance.\u201d said\u00a0Sebastian Profili, Project Manager at DL Panama.\u00a0\u201cThe straton IEC61131-3 programming environment made it easy for us to develop the required interfaces to the many devices at each station. The high-reliability of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/\" \/>\n<meta property=\"og:site_name\" content=\"straton\" \/>\n<meta property=\"article:published_time\" content=\"2020-05-28T12:43:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-29T09:06:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/straton-plc.com\/wp-content\/uploads\/2020\/05\/Panama-metro-line-2-with-straton-IEC-61131-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Julie Tobaruela\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Julie Tobaruela\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/\"},\"author\":{\"name\":\"Julie Tobaruela\",\"@id\":\"https:\/\/straton-plc.com\/#\/schema\/person\/c87e19e62b503b8e2fbe47e1e9a4c889\"},\"headline\":\"Managing a metro line with straton\",\"datePublished\":\"2020-05-28T12:43:35+00:00\",\"dateModified\":\"2020-07-29T09:06:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/\"},\"wordCount\":359,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/straton-plc.com\/#organization\"},\"articleSection\":[\"Actualit\u00e9s\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/\",\"url\":\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/\",\"name\":\"Managing a metro line with straton - straton\",\"isPartOf\":{\"@id\":\"https:\/\/straton-plc.com\/#website\"},\"datePublished\":\"2020-05-28T12:43:35+00:00\",\"dateModified\":\"2020-07-29T09:06:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/straton-plc.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Managing a metro line with straton\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/straton-plc.com\/#website\",\"url\":\"https:\/\/straton-plc.com\/\",\"name\":\"straton\",\"description\":\"Automation software\",\"publisher\":{\"@id\":\"https:\/\/straton-plc.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/straton-plc.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/straton-plc.com\/#organization\",\"name\":\"STRATON AUTOMATION\",\"url\":\"https:\/\/straton-plc.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/straton-plc.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/straton-plc.com\/wp-content\/uploads\/2022\/12\/Fichier-3.png\",\"contentUrl\":\"https:\/\/straton-plc.com\/wp-content\/uploads\/2022\/12\/Fichier-3.png\",\"width\":150,\"height\":45,\"caption\":\"STRATON AUTOMATION\"},\"image\":{\"@id\":\"https:\/\/straton-plc.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/straton-automation\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/straton-plc.com\/#\/schema\/person\/c87e19e62b503b8e2fbe47e1e9a4c889\",\"name\":\"Julie Tobaruela\",\"url\":\"https:\/\/straton-plc.com\/en\/author\/juliecezame\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Managing a metro line with straton - straton","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/","og_locale":"en_US","og_type":"article","og_title":"Managing a metro line with straton - straton","og_description":"DL PANAMA CHOOSES STRATON FOR PANAMA METRO LINE 2 DL Panama has chosen AU2MATION, historical straton distributor in the United States to provide a solution to support automation of key aspects of stations on Line 2 of the Panama Metro (Metro de Panama), elevated subway line, between San Miguelito and Nuevo Tocumen. This follows from a previous similar project in 2013 to automate station elements on Line 1, which currently links Los Andes County to the city centre. An MMIM, from UK vendor Metasphere, together with the straton IEC61131-3 programming environment has been deployed at each station to interface the SCADA system to lighting control panels. In addition, an MMIM is deployed at each water pumping station and interfaces the SCADA to an ITT Flygt pump controller that controls between 2-4 pumps, depending on the station. These are used to pump out water from the train lines due to extreme rainfall and flooding. \u201cWe needed a solution that would be easy to deploy and required minimal support and maintenance.\u201d said\u00a0Sebastian Profili, Project Manager at DL Panama.\u00a0\u201cThe straton IEC61131-3 programming environment made it easy for us to develop the required interfaces to the many devices at each station. The high-reliability of [&hellip;]","og_url":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/","og_site_name":"straton","article_published_time":"2020-05-28T12:43:35+00:00","article_modified_time":"2020-07-29T09:06:56+00:00","og_image":[{"width":600,"height":400,"url":"https:\/\/straton-plc.com\/wp-content\/uploads\/2020\/05\/Panama-metro-line-2-with-straton-IEC-61131-3.jpg","type":"image\/jpeg"}],"author":"Julie Tobaruela","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Julie Tobaruela","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#article","isPartOf":{"@id":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/"},"author":{"name":"Julie Tobaruela","@id":"https:\/\/straton-plc.com\/#\/schema\/person\/c87e19e62b503b8e2fbe47e1e9a4c889"},"headline":"Managing a metro line with straton","datePublished":"2020-05-28T12:43:35+00:00","dateModified":"2020-07-29T09:06:56+00:00","mainEntityOfPage":{"@id":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/"},"wordCount":359,"commentCount":0,"publisher":{"@id":"https:\/\/straton-plc.com\/#organization"},"articleSection":["Actualit\u00e9s","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/","url":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/","name":"Managing a metro line with straton - straton","isPartOf":{"@id":"https:\/\/straton-plc.com\/#website"},"datePublished":"2020-05-28T12:43:35+00:00","dateModified":"2020-07-29T09:06:56+00:00","breadcrumb":{"@id":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/straton-plc.com\/en\/managing-a-metro-line-with-straton\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/straton-plc.com\/en\/"},{"@type":"ListItem","position":2,"name":"Managing a metro line with straton"}]},{"@type":"WebSite","@id":"https:\/\/straton-plc.com\/#website","url":"https:\/\/straton-plc.com\/","name":"straton","description":"Automation software","publisher":{"@id":"https:\/\/straton-plc.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/straton-plc.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/straton-plc.com\/#organization","name":"STRATON AUTOMATION","url":"https:\/\/straton-plc.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/straton-plc.com\/#\/schema\/logo\/image\/","url":"https:\/\/straton-plc.com\/wp-content\/uploads\/2022\/12\/Fichier-3.png","contentUrl":"https:\/\/straton-plc.com\/wp-content\/uploads\/2022\/12\/Fichier-3.png","width":150,"height":45,"caption":"STRATON AUTOMATION"},"image":{"@id":"https:\/\/straton-plc.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/straton-automation\/"]},{"@type":"Person","@id":"https:\/\/straton-plc.com\/#\/schema\/person\/c87e19e62b503b8e2fbe47e1e9a4c889","name":"Julie Tobaruela","url":"https:\/\/straton-plc.com\/en\/author\/juliecezame\/"}]}},"_links":{"self":[{"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/posts\/16605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/comments?post=16605"}],"version-history":[{"count":2,"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/posts\/16605\/revisions"}],"predecessor-version":[{"id":18153,"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/posts\/16605\/revisions\/18153"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/media\/16642"}],"wp:attachment":[{"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/media?parent=16605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/categories?post=16605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/straton-plc.com\/en\/wp-json\/wp\/v2\/tags?post=16605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}